Abstract

A three-year research project (Pontalumis) was carried out for the development of an innovative simply supported hybrid footbridge, with 11m of length and 2m of width. The footbridge is composed of two pultruded I-shaped glass fibre reinforced polymer (GFRP) girders (400×200(×15)mm2) bonded and bolted to a 37.5mm thick deck in steel fibre reinforced self-compacting concrete (SFRSCC). The present paper describes the material/structural concept of this footbridge, its design and construction process, and summarises the response of the prototype when submitted to static short and long-term load tests, and dynamic load tests. The prototype was simple and fast to execute, presenting a reduced dead-weight of only about 3tonf. The static and dynamic behaviour of the prototype as well as its long-term deflection fulfil standards’ requirements for footbridge structures and are in good agreement with conventional analytical and numerical design tools.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call