Abstract
This article examines the effects of state-society relations for the development of hydropower programs in the North Western Ethiopia. The Beles valley is one of the major development corridor recognized in the country of which attempts were made to harness hydropower in the mid 1980s. In this valley, hydropower development program was initiated to enhance sustainable national economy through power production. However, this public investment has been facing challenges shortly after the commencement of the project. Methodologically, the paper is based on qualitative method conducted in cross sectional manner in the Beles upper valley, North Western Ethiopia. Data were collected through interviews, focus group discussions and consultation of secondary documents. The data were analyzed through thematic and content analysis. The major challenge of the hydropower development practice in the Beles valley was associated with state-actor relations. There was security dynamics by the move violence between the state force and insurgent armed group. The situation was further complicated by the society’s negative perception to the project attempted to be implemented in the upper stream by government. Related to these, low linkage between the Beles valley rural communities to the nearby administration and regional economy has also impacted the development of Beles hydroelectric projects. The article shows that how the state, actors and society relations affected the development projects attempted in mid 1980s for implementation in the Beles valley.
Highlights
The notion of development is better summarized as ‘development of any sort is about people concerning their indigenous development opportunity, standard of living, and the use of the available resources within their environment sustainably’ [2
The Beles upper stream hydropower development program was started in the mid1980s, and it had a number of hydropower plants planned for the production of substantial hydroelectric power by transferring Lake Tana water in to Beles River through tunnel
The projects were started in May 1986 with full efforts and undergone till the interruption of project works in January 1987. These large public investment was thought to be very promising in three terms: project location, water sources and local development
Summary
The notion of development is better summarized as ‘development of any sort is about people concerning their indigenous development opportunity, standard of living, and the use of the available resources within their environment sustainably’ [2. Whenever there are abundant water resources, hydroelectric power was a major driver of development worldwide. Initiated hydroelectric power plants were owned and operated by both private and government bodies. Belete F.G. RUDN Journal of Public Administration, 2019, 6(2), 121–132 level of development, countries perceived hydropower development in terms of using their own natural resources to meet growing industrial and domestic demands for electricity, energy security and self-sufficiency [12.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.