Abstract

The quality of raw water is getting worse in developing countries because of the inadequate treatment of municipal sewage, industrial wastewater and agricultural runoff. Aiming at the biofilm enrichment and pollutant removal, two pilot-scale biofilm reactors were built with different biological carriers. Results showed that compared with the blank carrier, the biofilm was easily enriched on the biofilm precoated carrier and less nitrite accumulation occurred. The removal efficiencies of NH4+-N, DOC and UV254 increased under the aeration condition, and a optimum DO level for the adequate nitrification was 1.0–2.6mgL−1 with the suitable temperature range of 21–22°C. Study on the trihalomethane prediction model indicated that the presentence of algae increased the risk of disinfection by-products production, which could be effectively controlled via manual algae removing and light shading. In this study, the performance of biofilm pretreatment process could be enhanced under the optimized condition of DO level and biofilm carrier.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.