Abstract

Simultaneous partial nitrification, anammox and denitrification (SNAD) process was started-up in a 2.5L sequencing batch biofilm reactor (SBBR) using novel biomass carriers. The SNAD process took only 51d for start-up at nitrogen loading rate (NLR) and organic loading rate (OLR) of 120 and 60g/m3-d, respectively. Long-term stable operation of SNAD process was observed at NLR and OLR of 360 and 180g/m3-d with average total nitrogen and COD removal efficiencies of >88% and >90%, respectively. The values of conversion ratio Y(NO2-+NO3-)/NH4+ remained below 0.11 after the start-up period, which further confirmed the long-term stability of SNAD process. Results of polymerase chain reaction (PCR), qualitative PCR, and scanning electron microscopic (SEM) analysis of sludge samples confirmed the co-existence and enrichment of AOB, anammox bacteria and denitrifying bacteria in the reactor and biofilm formation on to the carriers.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call