Abstract

We have investigated the start-up flow and yielding of a simple yield-stress fluid (Carbopol 940) in a vertical pipe. The Carbopol was displaced from below by a Newtonian liquid (Fluorinert FC-40) injected at the bottom of the pipe. Rough and smooth-walled pipes were used to study the effects of wall boundary conditions. The shear stress at the wall was known from the pressure in the Carbopol measured by a pressure gauge fixed on the pipe wall. The shear rate was known from measurements of velocity profile in the Carbopol made using particle-image velocimetry. In the rough-walled pipe, the yielding involved a long transit with several steps: elastic deformation, the onset of wall slip, yielding at the wall, and finally a steady-state plug flow that is well-described by the predictions of the Herschel–Bulkley model. In contrast, in the smooth-walled pipe, the wall shear stress never exceeded the yield stress. Our results demonstrate the importance of elasticity during the yielding process, particularly for faster displacements.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.