Abstract
The objective of this study was to improve the nitrogen removal efficiency and reduce the start-up period of a single-stage partial nitritation-anammox (SPNA) system using iron particle-integrated anammox granules (IP-IAGs). Anammox granules were enriched in sequencing batch and expanded granular sludge bed (EGSB) reactors. The EGSB reactor produced larger and more uniform granules with higher specific anammox activity. IP-IAGs were then inoculated into a two-stage partial nitritation-anammox reactor treating anaerobic digestion (AD) effluent, followed by an internal recirculation strategy to acclimate the granules to oxygen exposure for SPNA. Finally, the SPNA process operated to treat real AD effluent under optimal conditions of 0.05 L/min aeration intensity (0.01 vvm) and 24 h of hydraulic retention time, achieving TNRE of 86.01 ± 2.64 % and nitrogen removal rate of 0.74 ± 0.04 kg-N/m3·d for 101 d.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.