Abstract

PurposeThe purpose of this paper is to introduce the use of critical success factors (CSFs) of stakeholder management as a possible solution to reduce disputes experienced because of legal and regulatory issues in public–private partnership (PPP) projects.Design/methodology/approachThis paper’s epistemological positioning adopted positivism and deductive reasoning to investigate the dispute phenomena on PPP projects. A survey strategy was adopted using a structured questionnaire and closed-ended Likert scales to collate primary data. Questionnaires were distributed to South African construction professionals using both purposive and snowballing non-probability sampling techniques. Data was analysed using summary statistical analysis of the CSFs identified from literature.FindingsThis study revealed that among the 19 CSFs identified, five factors were highlighted that could contribute to the alleviation of disputes between stakeholders in PPP projects, namely, adequate project planning and control; effective leadership; appropriate strategies for the management of stakeholders; confirmation of clear goals and objectives of the project; and effective communication.Originality/valueThe strength of this study lies in the evaluation and use of CSFs of stakeholder management as a possible solution to minimise or even avoid disputes as a result of legal and regulatory issues in PPP projects. By integrating the CSFs, the legal and contractual misconceptions of the PPP initiative are clarified. Such work represents a novel contribution to procurement practice in South Africa and maybe to other countries internationally who are grappling with similar issues.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call