Abstract

This paper proposes an efficient, stage-wise optimisation model for scheduling part-time staff. During stage 1, the problem is formulated as a totally unimodular integer linear programme (ILP) that produces integer solution upon solving its LP relaxation. The model produces optimum work shifts of various lengths along with the optimal number of employees needed in each shift while minimising the total labour time. In the second stage, an assignment model is used to allocate employees to various work shifts while maximising their preferences. The stage-wise model has the necessary flexibility and computational efficiency to solve many real-world business scheduling problems, as illustrated by three separate case studies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.