Abstract

Shift scheduling problems (SSPs) are advanced NP-hard problems which are generally evaluated with integer programming. This study presents an applicable shift schedule of workers in a large-scale natural gas combined cycle power plant (NGCCPP), which realize 35.17% of the total electricity generation in Turkey alone, as at of the end of 2018. This study included 80 workers who worked three shifts in the selected NGCCPP for 30 days. The proposed scheduling model was solved according to the skills of the workers, and there were nine criteria by which the workers were evaluated for their abilities. Analytic network process (ANP) is a method used for obtaining the weights of workers’ abilities in a particular skill. These weights are used in the proposed scheduling model as concepts in goal programming (GP). The SSP–ANP–GP model sees employees’ everyday preferences as their main feature, bringing high-performance to the highest level, and bringing an objective functionality, and lowering the lowest success of daily choice. At the same time, the model introduced large-scale and soft constraints that reflect the nature of the shift requirements of this program by specifying the most appropriate program. The required data were obtained from the selected NGCCPP and the model solutions were approved by the plant experts. The SSP–ANP–GP model was resolved at a reasonable time. Monthly acquisition time was significantly reduced, and the satisfaction of the employees was significantly increased by using the obtained program. When past studies were examined, it was determined that a shift scheduling problem of this size in the energy sector had not previously been studied.

Highlights

  • Personnel efficiency and productivity is one of the basic objectives of many companies and organizations

  • When we look at the resources with the largest share of electrical energy generation in the countries with the largest economies, coal is predominantly used in the United

  • The high share of natural gas in Turkey’s total electricity generation with the above-mentioned advantages of the natural gas combined cycle power plant (NGCCPP) and the importance of the personnel scheduling in the power plants are taken into consideration together, and the objective of the study is to schedule the shift personnel fairly and according to their capabilities in the large-scale

Read more

Summary

Introduction

Personnel efficiency and productivity is one of the basic objectives of many companies and organizations. Previous works on SSPs have mainly focused on factory or security personnel, health personnel (i.e., doctors and nurses), teachers, and police officers For this reason, this study is a new application of models for shift scheduling problems (SSPs) and will be relevant to solving SSPs. When the distribution of resources used in electricity generation in the world is examined, it is seen that the most widely-used resource for electricity generation is coal, after which natural gas is the second most common resource. The high share of natural gas in Turkey’s total electricity generation with the above-mentioned advantages of the NGCCPPs and the importance of the personnel scheduling in the power plants are taken into consideration together, and the objective of the study is to schedule the shift personnel fairly and according to their capabilities in the large-scale. Shift scheduling studies are very important in the energy sector, and above all, in power generation facilities

Related Works
Getting Faster Results
Methods
Case Study
Determining the Workers’
C8: Interference to generator defects
Proposed Goal Programming Model
Notations
Constraints
Analysis of The Result
Schedule