Abstract

A developing country like Bangladesh is establishing many power plants where coal is being used as a primary fuel. The generation of coal waste is increasing with the mining of coal, which may cause an adverse environmental effect. So, it is required to be managed in a proper manner, such as reuse and recycle the coal waste. The objective of this study is to investigate the significance of coal waste used as a road subgrade. Due to the lack of some physical and strength properties, the waste cannot be used directly as a subgrade. So, the investigation was done to stabilize the fresh coal waste with different percentages of fly ash such as 0%, 10%, 12% and 15% to justify the suitability of its intended use. It is found that with the increasing percentages of fly ashes, the plasticity index reduces significantly. With the addition of fly ash, the dry density increases, while the optimum moisture content decreases significantly. After analyzing the test result, it is found that coal waste with 15% fly ash having unconfined compressive strength and CBR value is 17.79 psi and 23.12% respectively which is sufficiently significant for use as road subgrade.

Highlights

  • Electricity is the key for development of any country

  • Both sieve analysis and hydrometer analysis were performed for fresh coal mine waste and the result is illustrated in a grain size distribution curve in [Figure 1]

  • If plasticity index is less than 10%, it can be used as road subgrade [5]

Read more

Summary

Introduction

Electricity is the key for development of any country. Coal is a major source of fuel for production of electricity in many countries round the globe [1]. The rapid economic development and industrialization has created a vast demand of energy all over the world [2]. The reason we keep building coal-based power plants is because it’s so inexpensive to use coal as an energy source. The experts have announced that the amount of gas reserve in Bangladesh will be diminished by 10-15 years. To sort out this upcoming problem initially, the government of Bangladesh is concentrating on construction of coal fired power plants

Objectives
Methods
Findings
Discussion
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.