Abstract
ABSTRACT A set of jobs has to be processed on identical machines. Every job may be processed on any available machine without preemptions. The criterion is to minimise the makespan (i.e. the completion time of the last job in a schedule). During the realisation of a schedule, durations of some jobs may deviate from the initial values estimated before scheduling. Other jobs have fixed durations that are known before scheduling. We conduct a stability analysis of the optimal semi-active schedule. First, we derive necessary and sufficient conditions for an optimal schedule to be unstable with respect to infinitely small variations of the non-fixed durations (the stability radius of an unstable schedule is equal to zero). Second, we show that the stability radius of an optimal schedule could be infinitely large. Furthermore, several lower and upper bounds on the stability radius have been established. Third, we derive a formula and develop an algorithm for calculating stability radii.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.