Abstract
In fracture zones, tunneling with a double-shield Tunnel Boring Machine (TBM) presents significant challenges, including deformation overrun of the surrounding rock, TBM jamming, and excavation face collapse. To assure the tunnel construction safety and efficiency, it is necessary and crucial to conduct a stability analysis of the tunnel surrounding rock when a TBM passes through the fracture zones. The tunnels from Jiadingshan Road Station to Anshan Road Station in Qingdao Metro Line 8 are constructed by double-shield TBMs. It inevitably passes through fracture zones with different deterioration levels and dip angles. In this study, based on this construction section, numerical models of fracture zones with different deterioration levels and dip angles were developed to analyze the displacements of tunnel vaults, inverts, and haunches. In addition, the maximum shear stresses of the surrounding rock were analyzed. Finally, the displacement and shear stress variation patterns of the surrounding rock with different deterioration levels and dip angles were obtained. The findings reveal the stability behavior of tunnels under various fracture zones. They can serve as a valuable reference and theoretical foundation for future tunnel construction projects utilizing double-shield TBMs in areas with fracture zones.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.