Abstract
AbstractRock pile is a rock block formed by weathering of bedrock, and its stability is lower than that of other rock and soil. Therefore, there are numerous difficulties in the construction of tunnels through rock pile. In this paper, TBM method, three step method and CD method are chosen as the basis of tunnel stability analysis, and the numerical model of surrounding rock excavation stability of tunnel passing through rock pile is established. In this paper, the tunnel excavation is simulated by numerical simulation software, and the stability analysis of tunnel under different construction methods is performed. Combined with the engineering background and calculation analysis, compared with the three construction methods, it is found that the CD method has the strongest comprehensive protection for tunnel construction and is a more suitable construction method for crossing the rock pile tunnel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.