Abstract
The paper studied a side slope engineering of highway in K29+450~K29+900 sections by making an on-site survey of landform and geological features of the side slope. By combining drilling, high-density electrical method and numerical simulation method, the depth and range of the sliding surface were determined. The stability of the side slope after an excavation in a normal and a rainfall conditions was analyzed using numerical simulation method, and simulation results show that in the normal condition the safety factor of the side slope is 1.12, and it is 1.05 in the rainfall condition; the distribution of plastic zones is wide, especially in the rainfall condition, the side slope has a large deformation and is in an unstable state. When a program of side slope reinforcement is chosen, the impact under rainfall condition should be considered in order to ensure long-term stability of side slope.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.