Abstract

Active deep hard rock metal mines with long mining history come with inherent problems of stability and mining induced issues. These hard rock mines once closed, still pose even greater environmental risks and stability concerns. The issues of post-mining impact on environment are usually undervalued and disregarded. It is very essential to give utmost importance to these mines by following standard mine closure methods and remediations using post-mining management plans for long-term monitoring and risk assessments associated with the mine for the safety of life and structures above. The area identified for the study is Kolar Gold Fields mine located in Karnataka, India. The mine was completely closed in 2000. The underground mine has been posing post-mining induced seismicity even today. Due to the complexity of the underground mine and the inaccessibility to the mine post closure, the Finite Element Method of approach has been used. The approach is developed to simulate a model similar to actual field conditions, subjecting them to the seismic loads, varying the parameters which play a significant role, assessing the entire Kolar Gold Fields mines for vulnerable zones subjected to post-mining induced effects and finally making it possible to evaluate the stability conditions of the deep hard rock underground metal mine. The simulations were carried out for the three cases with varying the peak ground acceleration (PGA) for a low PGA of 0.06g, for an intermediate PGA of 0.1g and high value of 0.2g. It can be inferred that as the acceleration is increased from 0.06g to 0.22g, there is a corresponding increase in ground acceleration observed at the ground surface for each case. The maximum acceleration for PGA of 0.06g is 0.071g, for PGA of 0.10g, it is 0.170g and for PGA of 0.22g it is 0.266g. The results were validated with the field observations (data of seismicity from installed seismic monitoring systems). The Finite Element Method of approach has aided in quick assessment of stability of the underground closed mine.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.