Abstract

Geological structures and performance of the geodynamic processes can affect engineering projects on their own. Hence, the stability analysis and designing methods for foreseeing the retaining and support system for tunnels are diverse and came from different points of view. So this study seeks to present stability analysis of Imam Reza tunnel in Ardabil Sarcham Road with a special focus on the impact of future earthquakes on its stability using numerical methods. In this study, first designing and operating the initial structure with the height of 5.5 m and a semi-circular cross section. Secondly, drilling with the height of 3m and the width of 7.34 m and with a rectangle cross section. For stabilization, Rock Mass Rating (RMR) geomechanical classification systems and methods used. At the stabilization level, the materials were examined in laboratory, regarding the properties of sides and roof of the tunnel and pressure on them. The results of physical and mechanical experiments shown that the compressive strength ranged from 400 kg/cm2 to 500 kg/cm2 on average. The elastic modulus is between 12 and 13 GPa for the rocks. The Cohesion (C) ranged from 4-5MPa to 5 MPa and the Angle of Internal Friction (φ) is between 60ᵒ and 50ᵒ.

Highlights

  • The tunnel industry considered that tunnels were naturally resistant to earthquake action for many years, as they did not experience the same high levels of shaking as surface structures

  • The second stage includes drilling in the lower part with the height of 3m and the width of 7.34m and with a rectangle cross section

  • The extent and scope of utilizing the rocks as retainers, depends on geologic conditions in the underground space and these depend on that to which extent the designing is sensitive to the conditions and how much it wants to include them in the design

Read more

Summary

Introduction

The tunnel industry considered that tunnels were naturally resistant to earthquake action for many years, as they did not experience the same high levels of shaking as surface structures. Due to the fact that boring a tunnel requires relatively high costs, any mistake in studying, analyzing, and operating the support systems as well as utilizing them improperly, leads to wasted capital and it prevents us from reaching our goals. Regarding these explanations, it’s necessary to suggest a single or mixed support system through a complete analysis of different geological and geomechanical parameters so that it will get the highest efficiency with the lowest cost. Full check of the properties of rock mass and its situation is one of the crucial issues of reaching this purpose

Methods
Results
Discussion
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.