Abstract

The Xiamen Haicang double-arch tunnel has a maximum span of 45.73 m and a minimum burial depth of 5.8 m. A larger deformation or collapse of the tunnel is readily encountered during tunnel excavation. It is therefore necessary to select a construction approach that is suitable for double-arch tunnel projects with an extra-large span. In this study, three construction methods for double-arch tunnels with extra-large spans were numerically simulated. Subsequently, the deformation behavior and stress characteristics of the surrounding rock were obtained and compared. The results showed that the double-side-drift method with temporary vertical support achieves better adaptability in the construction of such tunnels, which can be observed from both the numerical results and in situ monitoring data. In addition, the improved temporary support plays a critical role in controlling the surrounding rock deformation. In addition, the disturbance resulting from the excavation of adjacent drifts was obvious, particularly the disturbance of the surrounding rock caused by the excavation of the middle drift. The present findings can serve as the initial guidelines for the construction of ultra-shallowly buried double-arch tunnels with extra-large spans.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call