Abstract
Abstract Demonstrating the feasibility of constructing tunnels in deep clay formations is an important goal of the Belgian RD&D programme on the geological disposal of radioactive waste. In 2002 a major achievement was reached when the HADES Underground Research Laboratory (URL) in Boom Clay was extended with the construction of the Connecting Gallery. This demonstrated that it is feasible to construct galleries in poorly indurated clays using industrial techniques. To monitor the mechanical behaviour of the gallery and assess its stability, strain gauges were embedded in the segmental gallery lining and prisms were installed on the segments. These sensors provide valuable information that will support the design of future galleries. This paper presents 20 years of monitoring data in the Connecting Gallery and a first analysis of these data in terms of Boom Clay behaviour. In addition, the key findings are compared with those of a similar analysis performed by Andra (the French Radioactive Waste Agency) at the Meuse/Haute-Marne URL. The latter URL is excavated in the Callovo-Oxfordian claystone. The comparison identifies general trends and highlights similarities between the behaviour of tunnels in poorly indurated clay (Boom Clay) and in claystone.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.