Abstract

We study scheduling problems when jobs can be split and a setup is required before processing each part, to minimize the weighted sum of completion times. Using a simple splitting strategy and a reduction to an orders scheduling problem we derive a 2-approximation algorithm for the case with uniform weights and setups, improving upon previous work. We extend this idea to the general identical machine case and conclude by designing a constant factor approximation algorithm when machines are unrelated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.