Abstract
AbstractDuring the last year, Sogin (the Italian company in charge for decommissioning of Italian nuclear power plants) had to implement an accelerated decommissioning plan of a EUREX spent fuel pool due to finding a water leakage into the environment from the pool. EUREX is no longer operating a pilot reprocessing plant, which some years ago became the responsibility of Sogin. There were 52 spent fuel assemblies from the Trino Vercellese PWR nuclear power plant, 48 irradiated pins from a Garigliano BWR fuel assembly, and 10 plates from an irradiated MTR fuel assembly stored in the EUREX pool, so the first step of the accelerated decommissioning plan consisted in the evacuation of this spent fuel. Considering the necessity to start the evacuation as soon as possible, Sogin decided to use an already existing cask (AGN-1) used in the past for the transport of Trino and Garigliano fuel assemblies. This cask was requalified in order to obtain a transport licence for the fuel assemblies stored in the EUREX poo...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Packaging, Transport, Storage & Security of Radioactive Material
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.