Abstract

We consider the power-aware problem of scheduling non-preemptively a set of jobs on a single speed-scalable processor so as to minimize the maximum lateness. We consider two variants of the problem: In the budget variant we aim in finding a schedule minimizing the maximum lateness for a given budget of energy, while in the aggregated variant our objective is to find a schedule minimizing a linear combination of maximum lateness and energy. We present polynomial time algorithms for both variants of the problem without release dates and we prove that both variants become strongly \(\mathcal{NP}\)-hard in the presence of arbitrary release dates. Moreover, we show that, for arbitrary release dates, there is no O(1)-competitive online algorithm for the budget variant and we propose a 2-competitive one for the aggregated variant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.