Abstract
Increasing number and capacity of wind turbines have overgrown connection to the distribution network. Considerable wind power plant installed capacity makes their connection to the transmission network a common practice today. However, large scale wind power integration requires increase in transmission network capacity. The problem with transmission network capacity investments is that they will be fully utilized only on rare occasions. This makes the investments in power lines reinforcement economically questionable. The transmission network capacity problems get even worse when several large wind power plants with simultaneous peaks in production are connected to the transmission network in the same node.The objective of this paper is to provide an insight in the issues of large-scale wind power plant integration into the transmission grid in Croatia. An accurate and detailed model for assessing power flows and voltage levels has been developed as a result of multiple projects involving wind power plant connections to the Croatian transmission network. Problems of large-scale wind power plant integration into the Croatian transmission network are addressed and solutions acceptable for both the investors and the Transmission System Operator are proposed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.