Abstract

The state of generating capacities installed at Russian power stations is analyzed. It is shown that a total of 49.5 GW of capacities that are now in operation must be decommissioned by the year 2020 according to a forecast calculation. A plan of stage-by-stage commissioning of new generating capacities is outlined. Results of the first experience gained from new construction of power facilities are presented, and problems relating to involvement of Russian and foreign investors are pointed out.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.