Abstract
Under this consideration there is a process of potable water purification, where the chemical and physical characteristics (water turbidity and color, aluminum and chlorine content, etc) are monitored. To work with correlated characteristics it is necessary to apply to multivariate methods. The peculiarities of Hotelling charts plotting for individual observations are well known, but generalized variance charts plotting causes some problems connected with the assessment of covariance matrix for individual observations. Solving this problem one question arises: how often is it necessary to update the limit lines on the charts? We suggest applying to the test methods of the hypothesis on the equality of the mean.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.