Abstract

The paper observes various technologies of diaphragm wall implementation as a shoring system in excavation pits. Protection of the adjacent existing buildings and structures and maximal removal of the impact to the existing city building system during construction process are considered as the key positive factor of the diaphragm wall technology. The consideration is made basing on the completed projects within dense existing building system of Saint-Petersburg where each free land plot is valuable and shall be used with the maximum benefit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.