Abstract
A purpose-built high tech machining solution developed by Furmanite has successfully repaired a 5.5m diameter pump-turbine unit at Dinorwig power station in North Wales — one of Europe's largest pumped storage power stations. The achievement avoided the need for an extended shutdown and ensured that no generating time was lost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.