Abstract

The installation of two 135 MVAr capacitor banks in a 345 kV substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. The authors present some of the special problems encountered in the design of the substation and the results of the tests performed during commissioning of the capacitor banks.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.