Abstract

The first electrons were accumulated in the newly completed 3-GeV SPEAR 3 storage ring on December 15, 2003, five days after the beginning of commissioning. By mid-January of 2004, 100 mA were stored, the maximum current allowed in the first phase of SPEAR 3 operation, and ring characterization and tuning continued until early March when the first photon beam line was opened for users. After the first year of operation the SPEAR 3 beam properties and ring performance had been extensively measured. These include micron stability using slow orbit feedback, an emittance coupling of ∼ 0.1% and 50-h lifetimes. The performance of SPEAR 3 during its first year of commissioning and operation and the improvement plans are described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.