Abstract
ABSTRACT Site selection for wind power plant (WPP) installation is a complex process that includes not only technical requirements but also physical, economic, social, and environmental sanctions. This study was carried out to determine optimal sites for WPP installation within the borders of Çanakkale province using spatial multi-criteria decision analysis (MCDA). Within the scope of the study, sites with a high level of suitability where a WPP can be established were determined by the geographic information system (GIS) and the analytical hierarchy process (AHP). The results were examined in two ways: by excluding and not excluding forest areas. After creating the two separate suitability maps, the annual electrical power generation potential (GP) map of the study area was generated. The results show that for the case where the forest areas were excluded, 67.26% of the study area is restricted and 29.94% is highly suitable, and for the case where the forest areas were not excluded, 58.94% is restricted and 36.25% is highly suitable. The total GP value of the highly suitable sites is 104,061.61 GWh/year. When the locations of existing WPPs were examined for control purposes, it was seen that the majority of them were located inside the areas with high suitability and outside the non-installable areas, but some of them were established in forested areas.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.