Abstract

Performance-based logistics (PBL) is emerging as a preferred logistic support strategy within the public sector, especially the Department of Defence. Under a PBL strategy, the customer buys performance, such as operational availability, mission readiness and operational reliability, instead of contracting for a specified collection of resources defining the underlying support infrastructure. The literature on PBL is still in its infancy and additional research is required to optimize logistic resources such as spare parts, equipment, facilities, labour etc within a PBL context. In this paper, an optimization model is developed for spares provisioning under a multi-item, multi-echelon scenario. The objective of the optimization model is to maximize the profit to the supplier under a PBL contract.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.