Abstract

The second, full‐duration test of the space shuttle's main propulsion system was conducted successfully on February 28, at the NASA test site in Mississippi. Officials responsible for shuttle propulsion system development said afterwards that all test objectives had been met during the 555‐second firing.Cited as noteworthy was the fact that the three main engines used in the test were successfully gimballed (steered) while they were being throttled back from 100% to 70% thrust, the first time that maneuver had been attempted.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.