Abstract

ABSTRACTIn March 2000, a document entitled Draft Regional Planning Guidance for the South East was published with the primary aim of providing a regional framework for the preparation of development plans to the year 2016.This paper discusses the potential effects for the water industry of SERPLAN’s predicted levels of housing growth on water resources, sewage treatment and the environment. The need for sustainable development with the competing pressures of water‐resource limitation, changing regulation, increasing demand and the environment, are discussed. Thames Water’s scale of operations is described together with the range of measures aimed at managing the reasonable demands of customers, consistent with achieving sustainable growth. Basingstoke is described as a wastewater case study, highlighting the problem in fulfilling the sewerage undertaker’s statutory duties in (a) meeting already stringent effluent‐treatment standards which are necessary to maintain and improve river quality, and (b) providing the necessary infrastructure for an area which is earmarked for continuing development.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.