Abstract

South Carolina Department of Health and Environmental Control (SCDHEC) reviewed 105 primary documents during fiscal year 1995 (October 1, 1994 through September 30, 1995). The primary documents reviewed consisted of 27 RCRA Facility Investigation/Remedial Investigation (RFI/RI) workplans, 13 RFI/RI Reports, 12 Baseline Risk Assessments (BRA`s), 27 Site Evaluation (SE) Reports, 8 Proposed Plans, 5 Record of Decisions (ROD`s), 6 Remedial Design Workplans, 6 Remedial Action Workplans and 10 miscellaneous primary documents. Numerous other administrative duties were conducted during the reporting period that are not accounted for above. These included, but were not limited to, extension requests, monitoring well approvals, and Treatability Studies. The list of outgoing correspondence from SCDHEC to the Department of Energy (DOE) and Westinghouse Savannah River Company (WSRC) is attached.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.