Abstract

Abstract We report some results of our use of the GASP-IV simulation package to test the model described in our paper entitled, An Unreliable Series Production Line: Keeping It Running With Buffer Stocks. The results show that the total production rate does not appear to affect significantly the maximum (non-zero) space allocated uniformly to inter-equipment buffer stocks. However, they do show that other quantities are affected by the maximum buffer space. For example, the average number of items queueing at each station decreases with an increase in the index of the station. Also, the position of the slowest machine appears to be irrelevant.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.