Abstract

This paper studies scheduling problems which include a combination of nonlinear job deterioration and a time-dependent learning effect. We use past sequence dependent (p-s-d) setup times, which is first introduced by Koulamas and Kyparisis [ Eur. J. Oper. Res. 187 (2008) 1045–1049]. They considered a new form of setup times which depend on all already scheduled jobs from the current batch. Job deterioration and learning co-exist in various real life scheduling settings. By the effects of learning and deterioration, we mean that the processing time of a job is defined by increasing function of its execution start time and a function of the total normal processing time of jobs scheduled prior to it. The following objectives are considered: single machine makespan and sum of completion times (square) and the maximum lateness. For the single-machine case, we derive polynomial-time optimal solutions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.