Abstract

The relocation problem originates from the public housing project so as to minimize the budgets. Given a set of jobs each demands nt units of resources for processing and returns a, units of resources. The relocation problem is to determine the minimum resource requirements demanded by the successful completion of this set of jobs. In the literature, an O(h∗log h) algorithm has been proposed by Kaplan and Amir, where h is the number of jobs. In this paper, we consider the relocation problem with processing times and deadlines in which each job is additionally associated with a processing length and an individual deadline. Studies of NP-completeness of some versions of this problem are included. Also, we propose two polynomial algorithms, one runs inO(h∗log h)time and the other in O(h2∗log h)time, to solve some further restricted problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.