Abstract

The article deals with the problems of pricing in the construction industry that arose in the process of reforming the system and introducing innovative approaches to determining the estimated cost of construction, reconstruction and major repairs of capital construction objects. Possible consequences are described for the identified problems and recommendations for their elimination are given. The cost of repair and construction works calculated by different methods is compared. The amount of losses of the construction works manufacturer from the use of an imperfect system for calculating the cost of delivering materials to an on-site warehouse for objects of budget financing in the Irkutsk region is calculated.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call