Abstract
This paper considers the same problem as studied previously by Cheng which is concerned with the optimal determination of TWK-power due-dates and sequencing of n jobs on a single machine. A detailed analysis of the cost function used in Cheng's model is presented from which we note that under suitable assumptions a very simple way to find the optimal solution is available. An extension of the original due-date sequencing optimization problem is discussed and the necessary and sufficient optimality conditions for the extended problem are derived.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.