Abstract
In western part of Sweden 80 km of a new motorway and a new high speed railway will be constructed on soft, high-plastic clay. In order to reduce the settlements and improve the stability conditions of the embankments, lime-cement columns will be used extensively, i.e. some 9 million linear metres of columns will be installed. Already during the feasibility studies, in year 2000, a large amount of test-columns were installed in order to study their geo mechanical properties (strength, stiffness, permeability). Furthermore 3 full-scale test embankments, founded on lime-cement columns not reaching firm bottom were constructed in year 2001. The test embankments were considered necessary due to lack of reliable design methods for estimating consolidation settlements of embankments founded on floating columns. The embankments were heavily instrumented in order to study the settlements of the embankments.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.