Abstract

In this paper we consider the Multi-Mode Resource-Constrained Project Scheduling Problem with makespan minimisation as the objective. We have developed new genetic algorithms, extending the representation and operators previously designed for the single-mode version of the problem. Moreover, we have defined a new fitness function for the individuals who are infeasible. We have tested different variants of the algorithm and chosen the best to be compared to different heuristics previously published, using standard sets of instances included in PSPLIB. Results illustrate the good performance of our algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.