Abstract

In this paper, a problem in the area of scheduling, namely Fuzzy Stochastic Resource-Constrained Project Scheduling Problem (FS-RCPSP), is addressed. Like the original Resource-Constrained Project Scheduling Problem (RCPSP), the objective is to minimise the expected makespan of the project subject to precedence and resource constraints. However, due to mixed uncertainty comprising fuzziness and randomness in the estimates of activity durations, the makespan is a fuzzy stochastic number. Recognising both fuzziness and randomness in activity durations results in more robust schedules but the scheduling problem is harder to solve. A hyper-heuristic, named Self-adaptive Differential Evolution to Scheduling Policy (SADESP) is proposed to address this issue. SADESP has two key modules: (1) a module (policyEvolver) which evolves scheduling policy and (2) a dynamic scheduling procedure (dScheduler) which makes scheduling decisions using a particular scheduling policy. The performance of SADESP is benchmarked against CPLEX across an extensive set of 960 problems created with ProGen – a standardised problem generator for creating benchmark problems in scheduling. The results returned by SADESP for FS-RCPSP are very encouraging, both in terms of accuracy and computational performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.