Abstract
This paper proposes a two-stage framework for developing hybrid approaches to solve the three printed circuit board assembly (PCBA) problems, component sequencing problem (CSP), feeder assignment problem (FAP), and nozzle assignment problem (NAP), simultaneously for a multi-head gantry SMT (surface-mounting technology) machine. The three essential PCBA problems affect the productivity of a multi-head gantry SMT machine considerably. However, due to the difficulty and complexity, the NAP (which assigns a given set of nozzles to the assembly heads of a machine) has been often neglected or roughly resolved in past research. The lack of considering the NAP leads to the underestimation of the total assembly time required for one printed circuit board (PCB) and eventually results in inaccurate production planning. The two-stage framework consists of metaheuristic and dynamic programming (DP) methods, which can deal with the three PCBA problems systematically. Various metaheuristics including firefly algorithm (FA), improved FA (IFA), genetic algorithm (GA), particle swarm optimization (PSO), and whale optimization algorithm (WOA) have been respectively used in this framework and experiments have been conducted to investigate their effectiveness. The results show that the hybridization of IFA with DP outperforms the others in terms of total assembly time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.