Abstract

In this paper, we propose a hybrid genetic algorithm with fuzzy logic controller (flc-rkGA) to solve the resource-constrained multiple project scheduling problem (rc-mPSP) which is well known one of NP-hard problems and the objective in this paper is to minimize total complete time in the project. It is difficult for treating the rc-mPSP problems with traditional optimization techniques. The new approach proposed is based on the hybrid genetic algorithm (flc-rkGA) with fuzzy logic controller (FLC) and the random-key encoding. For these rc-mPSP problems, we demonstrate that the proposed flc-rkGA to solve the rc-mPSP problem yields better results than several heuristic genetic algorithms presented in the computation result.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call