Abstract

To solve the resource-constrained multiple project scheduling problem (RCMPSP) more effectively, a method based on timed colored Petri net (TCPN) was proposed. In this methodology, firstly a novel mapping mechanism between traditional network diagram such as CPM (critical path method)/PERT (program evaluation and review technique) and TCPN was presented. Then a primary TCPN (PTCPN) for solving RCMPSP was modeled based on the proposed mapping mechanism. Meanwhile, the object PTCPN was used to simulate the multiple projects scheduling and to find the approximately optimal value of RCMPSP. Finally, the performance of the proposed approach for solving RCMPSP was validated by executing a mould manufacturing example.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.