Abstract
Two kinds of optimization problems, which can be used in production planning, have been considered: interval linear programming (ILP), finding equilibrium position interval for the Von Neumann model (bilinear problem). Initial data for these models commonly have interval uncertainty. The paper presents definitions of different solution types and methods for finding these solutions. These methods imply reducing interval optimization problems to exact ordinary linear programming problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.