Abstract

Flow shop scheduling problems have been analyzed worldwide due to their various applications in industry. In this article, a new genetic algorithm (NGA) is developed to obtain the optimum schedule for the minimization of total completion time of n-jobs in an m-machine flow shop operating without buffers. The working process of the present algorithm is very efficient to implement and effective to find the best results. To implement the proposed algorithm more effectively, similar job order crossover operators and inversion mutation operators have been used. Numerous examples are illustrated to explain proposed approach. Finally, the computational results indicate that present NGA performs much superior to the heuristics for blocking flow shop developed in the literature.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.