Abstract

The solvent recovery section from the exhaust gas represents an important auxiliary part for an industrial CO2 post-combustion capture plant by the reactive absorption-stripping process. In this work, a partial condenser and a water-wash section configuration were designed to reach 1 ppm of solvent in the exhaust gas, and compared using the Total Annual Cost (TAC) as economic index. Both the configurations ensured the required recovery performance. The results highlighted that the partial condenser alternative is more convenient in terms of capital annualized costs and water make-up, but at the same time it is strongly penalized by the high operating costs for the cooling water. Therefore, the configuration in which the absorber is equipped with the water-wash section resulted the option with the minimum TAC.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.