Abstract

Road traffic congestion has become a daily phenomenon in the central area of Pitesti in the peak traffic periods. In order to achieve the mobility plan of Pitesti, an important stage is the diagnostic analysis of the road traffic. For this purpose, the urban road network was formalized through a graph containing the most important 40 intersections and traffic measurements were made at all these intersections and on the main roads connecting the peri-urban area. The data obtained by traffic macrosimulation confirmed the overloading of the street network during peak traffic hours and the analyzes made for various road traffic organization scenarios have shown that there are sustainable solutions for urban mobility only if the road network is fundamentally reconfigured (a belt outside the city and a median ring). Thus, the necessity of realizing the road passage in the Prundu neighbourhood and the finishing of the city belt by realizing the “detour West” of the city is argued. The importance of the work is that it brings scientific arguments for the realization of these road infrastructure projects, integrated in the urban mobility plan, which will base the development strategy of the Pitesti municipality.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call