Abstract
Power Systems all around the World faced in the last decade a large increase of penetration of power generation produced by Renewable Energy Sources, a large part of which (in particular wind generation and solar generation) is affected by high levels of uncertainty. Being Renewable Energy Sources only partially controllable all this uncertainty is transferred into Power System operation. Thus, numerical simulation of Power Systems needs to be able to cope with this uncertainty, that is Stochastic Programming techniques have to be considered. Anyway, numerical simulation of Power Systems also involves a very large number of variables, some of which are of integer nature: a large scale mixed integer stochastic problem has thus to be solved, but the requirement in computational power and time could reveal to be far too large. Thus, heuristic procedures must be introduced. In this paper it is introduced the sMTSIM model, based on a Stochastic continuous relaxation of the mixed integer Unit Commitment problem and on an heuristic procedure capable of re-introducing the mixed integer constraints.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.