Abstract
A subgradient algorithm and a binary integer assignment algorithm are used in tandem to determine economic run quantities for an injection molding facility. The model considers machine regular time and overtime capability, machine-tool compatibility, storage area capacity, and the economics of lot size decisions. Use of the model in scheduling and alternative facility evaluation are discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have