Abstract

A subgradient algorithm and a binary integer assignment algorithm are used in tandem to determine economic run quantities for an injection molding facility. The model considers machine regular time and overtime capability, machine-tool compatibility, storage area capacity, and the economics of lot size decisions. Use of the model in scheduling and alternative facility evaluation are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call